Project Names |
Names of Awards |
Awarded on |
Prediction of durability and corrosion resistance of concrete in corrosive environment |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2017.6.28 |
Research and application of core technology of plain concrete rigid pile composite foundation |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2017.6.28 |
Construction method of controlled filling karst fissure grouting |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2017.6.28 |
Drilling construction with seawater slurry |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2017.6.28 |
The field direct shear test construction method ,based on multi-point displacement measurement |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level III |
2017.6.28 |
Measuring and 1:500 topomaping for Cangzhou Lingang econmy and technology development zone (west area) |
Prize Regarding Science and Technology under Hebei Society of Geodesy, Photogrammetry and Cartography Level III |
2016.8.15 |
The key technology and its applacation of super-large diammeter engineering hole forming method |
Hebei Provincial Prize for Progress in Science and Technology Level I |
2016.1.26 |
The development of SPT-1500 type trailer well rig |
Hebei Provincial Prize for Progress in Science and Technology Level III |
2016.1.26 |
Research of the loading capacity developed by the sealed and open pile toe concrete pouring technology |
Hebei Provincial Prize for Progress in Science and Technology Level III |
2016.1.26 |
The key technology and its applacation of super-large diammeter engineering hole forming method |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2015.7.10 |
Research and application of the soft foundation overall treatment technology |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2015.7.10 |
The development of SPT-1500 type trailer well rig |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2015.7.10 |
Research of the loading capacity developed by the sealed and open pile toe concrete pouring technology |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2015.7.10 |
Research of features of drift-sand project and improvement technology |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2015.7.10 |
Key Technology of Underground Space Excavation and Its Practical Use |
Hebei Provincial Prize for Progress in Science and Technology Level I |
2014-12-19 |
Research on Theory and Practical Use of Shaft Wall Design for Large-diameter Shaft
|
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2014-5-23
|
Research on Key Technology and Supporting Equipment of Spiral Borehole in Bed Rock
|
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2014-5-23 |
Testing Research on Exciting Method of Forced Vibration for Foundation
|
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2014-5-23 |
Research on Composite Supporting Structure System for Deep Foundation Pit of Piled Anchor and Soil Nailing |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level III |
2014-5-23 |
Research on Performance of and Optimal Design for Mix Proportion of Liquid Concrete Special for Cast-in-place Pile |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level III |
2014-5-23 |
Processing Technology of Dredger Filling Foundation and Its Engineering Application |
Hebei Provincial Prize for Progress in Science and Technology Level III |
2013-12-17 |
Project Regarding Control Survey of Cangzhou Coastal-port Economic and Technological Development Zone (East District) and 1: 500 Topographic Mapping |
Prize Regarding Science and Technology under Hebei Society of Geodesy, Photogrammetry and Cartography Level III |
2013-9-20 |
Processing Technology of Dredger Fill Foundation and Its Engineering Application |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2013-4-26 |
Comprehensive Testing Study into Composite Foundation of Plain Concrete Piles |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2013-4-26 |
Research on Key Technology for Reinforcing Eolian Sand Foundation by Dynamic Compaction |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2013-4-26 |
Research on Applied Technology Regarding Post Grouting for Cast-in-situ Bored Pile of Reverse Circulation |
Prize Regarding Achievements of Science & Technology for China’s Electric Power Construction Level III |
2012-5 |
Key Technology and Engineering Practice for Reinforcing Foundation of Super Soft Soil |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2012-5-23 |
Comprehensive Testing Study into Precipitation over Large Area Vacuum Well Points of Silty Soil Foundation |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2012-5-23 |
Research on Engineering Survey and Evaluation Methods for Buried Pipe System of Ground Source Heat Pump |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2012-5-23 |
Research on Rapid Assessment Methods and Shear Strength Characteristics of Regional Unsaturated Soil |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2011-6-9 |
Three-dimensional Simulation System for Monitoring Information and Supporting Structure of Deep Foundation Pit |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2011-6-9 |
Information System of Building Subsidence Monitoring |
Prize Regarding Progress in Science and Technology under China Society of Geodesy, Photogrammetry and Cartography Level III |
2010-11-9 |
Research on Packaged Technology for Ground Treatment of Current Sedimentary Soft Soil |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2010-6-30 |
R&D for Information System of Municipal Geotechnical Engineering |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level I |
2010-6-30 |
Research on Processing Technology and Engineering Geologic Characteristic of Red Clay |
Hebei Provincial Prize Regarding Progress in Science and Technology for Construction Industry Level II |
2010-6-30 |